Textured bathroom walls stripped before a tub becomes a walk-in shower
Example project
- Home
- 1970s two-story house in Lake Oswego with a hall bath upstairs
- Original request
- Replace the hall bath tub with a walk-in shower, tiled to the ceiling
- Testing
- Samples of the wall system of board, tape, joint compound and knockdown texture, and of the tub surround adhesive
- Found
- Asbestos in the joint compound and texture of the wall system
- Clear
- No asbestos in the tub surround adhesive or the ceiling
- Area
- About 300 sq ft of bathroom wall
- Timeline
- A ten-day notice period, then two days in the bathroom
- Cost
- $3,000
In this example, the owners of a 1970s house in Lake Oswego want a walk-in shower in place of the hall bath tub, tiled all the way up. The remodeler will strip every wall in the room down to the studs.

